    The project concerns the expansion of the district heating network in the municipality of Pristina and the corresponding increase of heat extraction capacity. There are no changes expected in fuel consumption in an existing lignite-fired combined heat and power (CHP) plant.

    Objectifs

    The project will contribute to the reduction of air pollution levels and the improvement of public health. The investment will improve living conditions and will ensure alignment with the EU standards. The operation will help build up economic and social resilience, placing priority on efficiency improvements.

    Commentaires

    The operation falls under the objectives of the EU Public Sector Guarantee of the Economic Resilience Initiative. * This designation is without prejudice to positions on status, and is in line with UNSCR 1244/1999 and the ICJ Opinion on the Kosovo declaration of independence.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Montant BEI envisagé (montant approximatif)

    EUR 25 million

    Coût total (montant approximatif)

    EUR 50 million

    Aspects environnementaux

    By virtue of its technical characteristics and location of the related components, as well as their expected negligible impact on environment, the project is not likely to require an Environmental Impact Assessment (EIA). Neither the construction nor the operation phase of the DH Project will result in changes in the actual and potential environmental impacts of the current power plant operation. The Project will not entail any increase of coal consumption or associated emissions. During appraisal the Bank will ensure that the potential environmental and social impacts of the Project are properly evaluated and the Project is implemented in line with the Bank's Environmental and Social Standards.

    Passation des marchés

    The related procurement processes has to follow the applicable public procurement rules and procedures will be examined during the appraisal and compliance with the EIB Guide to Procurement will be required.

    Statut

    À l'examen - 26/04/2019

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Kosovo* Énergie