    Référence: 20180728
    Date de publication: 7 novembre 2019

    Promoteur – Intermédiaire Financier

    REPUBLIC OF CROATIA

    Lieu

    Description

    The project covers the Velika Gorica agglomeration, located a few kilometres south of Zagreb. The main objectives of the project are to achieve compliance with the Urban Wastewater Directive and the Water Framework Directive in minimizing discharges of wastewater pollutants by extending and rehabilitating the existing sewer network and constructing a tertiary wastewater treatment plant. The project has been reviewed by JASPERS.

    Objectifs

    The project will contribute to environmental protection and natural resource efficiency.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 6 million

    Coût total (montant approximatif)

    EUR 84 million

    Aspects environnementaux

    The project's components will contribute to ensure compliance with key EU directives in the water sector notably the Urban Waste Water Treatment Directive (91/271/EC) and the Water Framework Directive (2000/60/EC). Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by 2014/52/EU and Strategic Environmental Assessment (SEA) Directive 2001/42/EC will be respected. The promoter will in such case, prior to utilising any EIB funds, be responsible for transmitting to the Bank the non-technical summary of the EIA. For any part of the project that may impact on a nature conservation site, the promoter will be required to provide to the Bank an approval of the competent authority and information on the mitigating measures required to comply with the Habitats Directive 92/43/EEC.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/23/EU, 2014/24/EU or 2014/25/EU, where applicable, as well as Directives 92/13/EEC and 89/665/EEC) as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union (OJEU), as and where required.

    Statut

    À l'examen - 15/09/2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Croatie Eau, assainissement