    Référence: 20180681
    Date de publication: 4 décembre 2019

    Promoteur – Intermédiaire Financier

    GREENALIA SA

    Lieu

    Description

    The project will finance the development, construction and operation of 5 onshore wind farms in the region of Galicia, Spain. The plant has a total installed capacity of 74 MW and includes the ancillary infrastructure for grid connection.

    Objectifs

    The EIB financing for this operation is expected to have a significant impact, being one of the first greenfield renewable energy projects to be financed in Spain after the moratorium in 2012 and the new regulatory framework that came into effect in 2014. Additionally, the operation will contribute to the achievement of Spain 2020 targets for renewable energy and CO2 emissions reduction.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 41 million

    Coût total (montant approximatif)

    EUR 82 million

    Aspects environnementaux

    The project falls under the Annex II of the Environmental Impact Assessment (EIA) Directive (Directive 2014/52/EU amending the EIA Directive 2011/92/EU), and have been screened in by the competent authority, who confirmed that applicable EIA processes have been performed. The authorisation procedure has been completed for all wind farms and the relevant interconnection facilities.

    Passation des marchés

    The promoter has to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation: Directive 2014/23/EU/ 2014/24/EU or 2004/18/EC / 2014/25/EU or 2004/17/EC, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Approuvé - 20/12/2019

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).