    Référence: 20180544
    Date de publication: 19 décembre 2018

    Promoteur – Intermédiaire Financier

    REPUBLIC OF CROATIA

    Lieu

    Description

    The project covers the Rijeka agglomeration in Croatia and will include, inter alia, the construction and rehabilitation of sewerage treatement infrastructure (networks, pumping stations, stormwater overflows and a new wastewater treatment plant (WWTP) replacing the old, obsolete facility) and improvement works on the drinking water supply network to reduce losses from 30% to 23%.

    Objectifs

    The project will contribute to Environmental Protection and Natural Resource Efficiency.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 24 million

    Coût total (montant approximatif)

    EUR 232 million

    Aspects environnementaux

    The project's components will contribute to ensure compliance with key EU directives in the water sector notably the Urban Waste Water Treatment Directive (91/271/EC) and the Water Framework Directive (2000/60/EC). Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by 2014/52/EU and Strategic Environmental Assessment (SEA) Directive 2001/42/EC will be respected. The promoter will in such case, prior to utilising any EIB funds, be responsible for transmitting to the Bank the non-technical summary of the EIA. For any part of the project that may impact on a nature conservation site, the promoter will be required to provide to the Bank an approval of the competent authority and information on the mitigating measures required to comply with the Habitats Directive 92/43/EEC.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/23/EU, 2014/24/EU or 2014/25/EU, where applicable, as well as Directives 92/13/EEC and 89/665/EEC) as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union (OJEU), as and where required.

    Statut

    À l'examen - 25/03/2021

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Croatie Eau, assainissement