Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20180377
    Date de publication: 22 octobre 2024

    Promoteur – Intermédiaire Financier

    FEDERAL REPUBLIC OF NIGERIA

    Lieu

    Description

    The project will finance investments in gully erosion control, slope stabilisation, integrated watershed management and livelihoods improvement.

    Objectifs

    The aim is to support the Climate Adaptation process for Nigeria with capacity building on the planning, management, monitoring of watershed, erosion-related activities and disaster risk management. The overall objective is to reduce vulnerability to soil erosion and improve population livelihood in targeted watersheds in several states of the country in the context of adaptation to climate change.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Montant BEI envisagé (montant approximatif)

    EUR 175 million

    Coût total (montant approximatif)

    EUR 578 million

    Aspects environnementaux

    A Resettlement Policy framework has been developed as well as an Environmental and Social Management Framework. Each subproject will be subject to an environmental screening to determine in which environmental category it falls into and in addition, a Resettlement Action Plan or an Abbreviated Resettlement Action Plan will be prepared to the satisfaction of the Bank before moving to implementation.

    Passation des marchés

    The EIB will require the promoter to ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement.

    Statut

    Signé - 29/12/2020

    Milestone
    À l'examen
    Approuvé
    Signé
    11 décembre 2018
    29 décembre 2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Nigéria Eau, assainissement