    Référence: 20180190
    Date de publication: 29 mai 2019

    Promoteur – Intermédiaire Financier

    RENFE OPERADORA

    Lieu

    Description

    The project consists of acquisition of 211 electric trainsets of high capacity to replace ageing rolling stock in Madrid suburban rail services.

    Objectifs

    The project supports the shift of traffic to more sustainable transport modes and reduces related negative transport externalities. The project is expected to generate operating and maintenance costs savings. It should also improve the quality, accessibility and comfort of the services, as well as reduce the number of incidences. As one of the pillars of the plan for improvement of suburban services, fleet renewal is expected to foster modal shift from road to rail (or at least maintain rail modal share) and therefore to contribute to the reduction of accidents, pollution and noise levels especially within urban agglomerations, as well as carbon dioxide (CO2) emissions. The project will thus contribute to meeting the Bank's target for support to climate action. The project is eligible under Article 309 point (c) common interest. The project's compliance with the Lending Policy for Transport (Decision CA/452/11) is to be confirmed during the appraisal.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 1150 million

    Coût total (montant approximatif)

    EUR 2525 million

    Aspects environnementaux

    The investment proposed under the project does not fall under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU) as manufacturing and use of rail rolling stock is not included in either list. The need of EIA and/or assessment according to the Habitats Directive 92/43/EEC for associated facilities (e.g. maintenance workshops or depots), not included in the investment proposed but needed for the correct operation of the new rolling stock, will be analysed during the appraisal. Arrangements for the replacement or decommissioning of old rolling stock will be reviewed during appraisal. All else equal, the project is expected to have a positive environmental impact by contributing to modal shift from road to railways.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 2/12/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Espagne Transports