Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20180150
    Date de publication: 14 octobre 2019

    Promoteur – Intermédiaire Financier

    ELECTRICITY SUPPLY BOARD

    Lieu

    Description

    The project will finance a national programme for the roll-out of electricity smart metering infrastructure in the Republic of Ireland during 2019-2024.

    Additionality and Impact

    The project finances the national programme to deploy electricity smart meters in Ireland. This investment is increasing the operational efficiency of electricity distribution, improving network reliability and providing better information on electricity consumption which can increase energy savings, develop time-of-use pricing, demand response and promote retail competition. The investments will improve consumer's information on electricity consumption (thereby reducing information failure) and will contribute to reduce emissions of the electricity sector and thereby the climate externality. The project contributes to support the energy transition consistently with EU and national long-term climate and energy policies.

    Objectifs

    The project aims at modernising the electricity meters across the country, by providing ca. 2.25 million smart meters, communication infrastructure, as well as the necessary IT systems. Advanced metering systems will allow remote reading and near real-time consumption information to end-customers, thus enabling better access to consumption information. Ultimately, these capabilities will increase consumer awareness of cost of energy supply thus spur energy efficiency, more efficient management of the power system, and more efficient metering and customer management operations.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 450 million

    Coût total (montant approximatif)

    EUR 1047 million

    Aspects environnementaux

    The project comprises the installation of advanced electricity meters. Based on technical characteristics of the project it is unlikely that any Environmental Impact Assessment will be required. The main potential impact on environment is from the disposal of the old meters. Appraisal will review the promoter's procedures to confirm that they are in line with EU standards and good industry practice

    Passation des marchés

    The EIB will require the Promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 19/08/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Irlande Énergie