    Référence: 20180029
    Date de publication: 13 mars 2018

    Promoteur – Intermédiaire Financier

    MIROVA

    Lieu

    Description

    The project consists of an equity fund targeting renewable energy generation, energy storage and electrical vehicle charging infrastructure investments.

    Objectifs

    The fund's strategy is to capture long-term market opportunities driven by the transformation occurring in both European and global energy markets. The fund is (i) targeting investments in renewable energy projects, (ii) enabling infrastructure for renewable energy, such as flexible generation and storage as well as interconnection and transmission and iii) targeting investments in electric vehicles and their charging infrastructure.

    Secteur(s)

    • Transports - Transports et entreposage
    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 75 million

    Coût total (montant approximatif)

    EUR 500 million

    Aspects environnementaux

    Most of the fund's underlying infrastructure investments will either require a full environmental impact assessment (EIA) or a screening decision by the national competent authority to determine whether an EIA is required or not. The Bank will require the fund to ensure that its underlying investments respect the relevant EU directives and the environmental and social standards of the Bank.

    Passation des marchés

    The fund's investment guidelines will be required to ensure that procurement procedures applied by the underlying investments financed by the fund are in line with the provisions of the relevant directives. Most, if not all, of the projects financed by the fund are expected not to be subject to public procurement procedures as outlined in Directive 2004/17/EC or 2014/25/EU where applicable.

    Statut

    Signé - 25/10/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    France Pays de l’UE Espagne Transports Énergie