Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20180024
    Date de publication: 19 avril 2018

    Promoteur – Intermédiaire Financier

    IRISH CONTINENTAL GROUP PLC

    Lieu

    Description

    The project involves the construction of a passenger/vehicle ferry for the Irish Ferries' fleet - Irish Continental Group (ICG). The new vessel will provide additional capacity that is better adapted to demand from freight and passengers on the routes operated by the promoter. It will be constructed and operated in compliance with specifications and regulations from the European Union and the International Maritime Organisation (IMO). The vessel will also be constructed to EU environmental standards and certified for operations within the EU's emission control areas. The ship is scheduled for operations on the promoter's Irish Sea and Dublin-Cherbourg routes. The vessel will be constructed in the Flensburger Schiffbau-Gesellschaft shipyard located in Flensburg, Germany. This project is the second project under the Bank's Green Shipping Programme Loan (2015-0742), which was approved by the Board of Directors in 2016.

    Objectifs

    The project will result in the construction and operation of one cruise ferry with the capacity for 5 610 metres of freight lane and 1 800 passengers and crew.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 80 million

    Coût total (montant approximatif)

    EUR 172 million

    Aspects environnementaux

    The project would enable the promoter to reduce pollution and emissions through the modernisation of its fleet.

    Passation des marchés

    The promoter is a private company not operating in the utilities sector, and is thus not covered by EU directives on procurement. The Bank will, however, review the promoter's processes during the project's due diligence. The promoter has conducted its procurement process via a number of well-established shipyards.

    Statut

    Signé - 15/06/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Irlande Transports