Date de publication: 2 mai 2018
Promoteur – Intermédiaire Financier
TRANSPORT FOR GREATER MANCHESTERLieu
Description
The project consist of the extension of the Manchester Metrolink tram network with a 5.5-km new line from Pomona to the Trafford Centre with six new stops, and the purchase of ten additional tram vehicles.
Objectifs
This project will extend the metro network, reduce traffic congestion, improve travel times in the area and increase connectivity in Greater Manchester.
Secteur(s)
- Transports - Transports et entreposage
Montant BEI envisagé (montant approximatif)
GBP 125 million (EUR 142 million)
Coût total (montant approximatif)
GBP 368 million (EUR 417 million)
Aspects environnementaux
The project is expected to have a positive environmental impact when in operation, as private car drivers will shift to public transport use.
Passation des marchés
Procurement has been completed according to the national law and procedures.
Statut
Signé - 13/12/2019
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).