    Référence: 20180004
    Date de publication: 8 juin 2018

    Promoteur – Intermédiaire Financier

    SOFIA MUNICIPALITY

    Lieu

    Description

    The loan will be provided to Sofia Municipality for the construction of the second stage of Sofia Metro Line 3. The project includes a twin-track metro line approximately 3.8 km in length, 4 metro stations, and a railway stop for connection to the national railway network at the last metro station.

    Objectifs

    The new line will increase public transport passenger capacity, enhance modal shift and reduce congestion on the existing transport network, thus it is expected to improve access in the urban area and quality of life.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 22 million

    Coût total (montant approximatif)

    EUR 58 million

    Aspects environnementaux

    It is a requirement that all sub-projects must be implemented in compliance with EU environmental legislation and the promoter has identified those sub-projects for which it considers an Environmental Impact Assessment (EIA) is required. Should any sub-project have a negative impact on an area forming part of the Natura 2000 network (falling under the Habitats Directive 92/43/EEC or Birds Directive 2009/147/EC), the Bank would require the promoter to act according to the provisions of the aforementioned directives as transposed into national law. These matters will be clarified during the appraisal.

    Passation des marchés

    The EIB will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/25/EU and related Directive 92/13/EU) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 20/12/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).