Référence: 20170912
Date de publication: 23 septembre 2019

Promoteur – Intermédiaire Financier

SOCIETE DE PATRIMOINE DES EAUX DU NIGER

Lieu

Description

The project will finance the construction of a new drinking water treatment plant of Karey Gorou with a production capacity of 100 000 m3/day and related infrastructure (reservoirs, pipelines, pumping stations, connections) to adapt the existing water distribution system.

Objectifs

The project will increase the water production capacity for the city of Niamey, to cope with the water demand until 2030, by enabling the delivery of the new volumes to a beneficiary population of about 2 million and will support the expansion of the city through over 25 000 new household connections. As a result, it will also improve the living conditions of the local population and thus contribute to reduce migration as an adaptation strategy of the population caused by water scarcity in the Sahel region, bringing a positive impact on public health and social stability.

Secteur(s)

  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Montant BEI envisagé (montant approximatif)

EUR 105 million

Coût total (montant approximatif)

EUR 220 million

Aspects environnementaux

Inside the EU, the project components would be categorised under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU amended by 2014/52/EU and therefore would be subject to environmental screening to define if an EIA would be required according to the relevant competent authority. An EIA will be required for the project. The Bank will assess the environmental and social aspects of the project during appraisal to ensure adherence to its social standards. Climate change aspects will be further examined during appraisal.

Passation des marchés

The promoter will have to ensure that implementation of the project in line with EIB's Guide to Procurement.

Statut

Signé - 18/12/2019

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Niger Eau, assainissement