Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170863
    Date de publication: 21 mars 2018

    Promoteur – Intermédiaire Financier

    PUBLIC ENTITY(IES)

    Lieu

    Description

    The project consists of the purchase of about 200 rail passenger carriages and about 40 locomotives for regional and intercity services on the 1,230-km long broad/dual gauge network across Bangladesh as well as international services to India.

    Objectifs

    The project consists of the partial replacement of obsolete vehicles and a partial expansion of the fleet to better meet growing demand. The project is consistent with the 20 Year Railway Development Plan. The project will contribute to one of the sub-targets under Sustainable Development Goal 9, related to building resilient infrastructure and promoting sustainable industrialisation, namely: to develop quality, reliable, sustainable and resilient infrastructure, including regional and trans-border infrastructure, to support economic development and human well-being, with a focus on affordable and equitable access for all.

    Secteur(s)

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 110 million

    Coût total (montant approximatif)

    EUR 327 million

    Aspects environnementaux

    The project concerns the manufacture of rail rolling stock, an activity which falls outside the scope of the Environmental Impact Assessment (EIA) Directive 2011/92/EC as amended. The new rolling stock will meet current standards for crashworthiness, energy efficiency and emissions. The arrangements for the stabling and maintenance of the rolling stock and the need for related infrastructure improvements will be assessed during the appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Statut

    Signé - 14/12/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Bangladesh Transports