Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170759
    Date de publication: 17 septembre 2018

    Promoteur – Intermédiaire Financier

    CONSEIL DE DEVELOPPEMENT ET DE RECONSTRUCTION

    Lieu

    Description

    The project consists of an operation targeting urban development investments throughout Lebanon.

    Objectifs

    This project will improve mixed urban infrastructure in several cities throughout Lebanon.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 40 million

    Coût total (montant approximatif)

    EUR 100 million

    Aspects environnementaux

    The project is expected to have an overall positive environmental and social impact, by improving conditions of life for the population, inside cities where urban services are provided. The sub-projects are also expected to entail positive environmental impacts in both cities and the surrounding rural areas, in particular through the provision of sustainable water management, which is especially relevant in dry climates, urban public transport projects as well as the restoration of riverbeds and green corridors within the cities. This, in turn, is expected to generate positive externalities on public health and the quality of life of residents and tourists. The nature of the works may cause some disruption during construction such as traffic, noise and dust which can be largely mitigated, but no adverse impacts are expected on the environment during the operational phase. The project's compliance with all applicable national environmental legislation as well as the EIB's environmental and social principles, standards and practices, will be verified during the appraisal.

    Passation des marchés

    The promoter will be required to implement the project in accordance with procurement rules and procedures from the French Development Agency (AFD), and in compliance with the requirements and standards agreed between the EIB, the AFD and the Reconstruction Credit Institute (KfW) for projects under the Mutual Reliance Initiative (MRI) for operations outside the EU, as foreseen in the Bank's Guide to Procurement. In particular, calls for international tenders will be published in the Official Journal of the European Union (OJEU) in accordance with the Bank's Guide to Procurement.

    Statut

    À l'examen - 11/04/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Liban Aménagement urbain