    Référence: 20170694
    Date de publication: 22 octobre 2022

    Promoteur – Intermédiaire Financier

    NATIONAL AUTHORITY FOR TUNNELS

    Lieu

    Description

    The project consists of the rehabilitation of the existing metro line 2 of the Cairo metro network. The rehabilitation includes the renewal of the signalling system, power supply and parts of the tracks. Allocation under Framework Loan (FL) 2020-0144.

    Additionality and Impact

    The project is the rehabilitation of Cairo metro Line 2 to ensure continue reliable and safe metro operations and add much needed extra transport capacity. The project will improve the role of public transport in Cairo and promote sustainable mobility for its citizens. By supporting the shift of traffic from fossil fuelled private cars to collective and electric transport, the project will reduce negative externalities of road traffic (noise and air pollution, greenhouse gas emissions, road accidents and congestion), improving travel times and costs. In addition, the project contributes to more egalitarian access to jobs and study opportunities.


    The project shares the development priorities of Neighbourhood, Development and International Cooperation Instrument (NDICI), Global Challenges' Thematic Programme Priority Area 2 on sustainable mobility. The project also contributes to Team Europe Flagship 5 on Connected Economies, to a wide range of Sustainable Development Goals (SDGs) and to the Investment Plan of the Egyptian Ministry of Transport.


    The proposed operation has benefitted from substantial EIB advice and expertise and from a technical assistance (TA) funded by the EIB under the ERI TA envelope. EIB participation was key to the preparation of the feasibility study, and will remain important in terms of filling a funding gap and allowing the project to go forward according to the originally foreseen timetable. The project benefits from EIB's advantageous funding terms as it provides long tenor and affordable pricing.

    Objectifs

    The project is expected to deliver significant time savings to existing users of metro line 2 and to provide additional capacity to accommodate an increasing demand that would otherwise be absorbed by less environmentally friendly modes of transport. The upgrade of the metro line will improve the reliability of the existing metro service and further reduce headways during peak hours. It will represent a fast and affordable transport solution to the population, in particular to those who cannot afford owning a private car. Furthermore, the project will result in vehicle operating cost savings, lower air emissions and less accidents stemming from the expected modal shift from road to public transport.

    Commentaires

    The Project is part of the Urban Transport Infrastructure Framework, the aim of which is to finance large public transport projects in the cities of Alexandria and Cairo in Egypt over the next 5 years.

    Secteur(s)

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 240 million

    Coût total (montant approximatif)

    EUR 614 million

    Aspects environnementaux

    If the project was located within the EU, it could fall under Annex II of the EIA Directive 2011/92/EC, thus requiring a decision by the competent authority to determine whether a full environmental impact assessment (EIA) has to be carried out. The Bank shall investigate environmental and social aspects during appraisal and verify that the promoter has followed the relevant EU environmental and social principles, standards and practices. The Bank shall also verify the acceptability of the project in terms of likely environmental impacts and proposed mitigation and compensation measures.

    Passation des marchés

    The Bank will require the promoter to ensure that any procurement process is consistent with the Bank's procurement guidelines

    Statut

    Approuvé - 17/11/2022

    Milestone
    Approuvé
    17 novembre 2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Égypte Transports