    Référence: 20170690
    Date de publication: 25 octobre 2017

    Promoteur – Intermédiaire Financier

    ITALGAS RETI SPA

    Lieu

    Description

    The project is part of the promoter's on-going investment programme to upgrade and extend its gas distribution networks. The project includes (i) pipeline replacements (ii) extension of the networks with the associated connections and metering (iii) installation of smart meters and (iv) other supplementary investments to optimise and increase the efficiency of network management.

    Objectifs

    The project will contribute to improvements in security, safety and reliability of gas supply. The planned investments are aligned with the requirements of the regulatory framework, and should increase network and community safety, improving reliability and reducing the occurrence of leakages.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 360 million

    Coût total (montant approximatif)

    EUR 730 million

    Aspects environnementaux

    Based on their technical characteristics, the planned gas distribution system investment schemes most likely will not require an Environmental Impact Assessment (EIA). The project schemes are expected to have minimal environmental impact. The typically anticipated impacts are mainly temporary and relate to construction works. These impacts can usually be well managed by appropriate measures taken by the construction company in order to avoid unacceptable nuisance to other parties and the public.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, (Directive 2014/24/EU and 2014/25/EU, where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC) as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union, as and where required.

    Statut

    Signé - 19/12/2017

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Italie Énergie