Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170614
    Date de publication: 16 février 2018

    Promoteur – Intermédiaire Financier

    EGNATIA ODOS AE

    Lieu

    Description

    The proposed project is a framework loan to finance investment works on 7 000 small-scale, low-cost road safety improvements on regional roads in Greece.

    Objectifs

    The project will help reduce the number as well as the severity of road accidents at accident blackspots, through the implementation of low-cost road safety measures.

    Commentaires

    This is the largest stand-alone road accident blackspot programme financed by the Bank so far, as well as the largest Greek road safety improvement programme. The programme furthermore implements some of the main principles of Directive 2008/96/EC on road infrastructure safety management to a larger network outside of the Trans-European Transport Network (TEN-T).

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 235 million

    Coût total (montant approximatif)

    EUR 470 million

    Aspects environnementaux

    All schemes from this project are required to be implemented in compliance with EU environmental legislation and are expected to involve keeping existing rights of way. Some of the schemes may fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU, amending Directive 2011/92/EU. Should any scheme have a negative impact on Natura 2000 areas, or fall under the Habitats Directive 92/43/EEC or Birds Directive 79/409/EEC, the Bank would require the promoter to act according to the provisions of the aforementioned directives.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC or 2014/24/EU where applicable, and Directive 89/665/EEC) as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union as and where required.

    Statut

    Signé - 25/11/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Grèce Transports