Référence: 20170496
Date de publication: 23 octobre 2018

Promoteur – Intermédiaire Financier

SNAM 4 MOBILITY SPA,SNAM SPA

Lieu

Description

The project concerns the development of a network of 110 natural gas refueling stations for Compressed Natural Gas (CNG) and Liquefied Natural Gas (LNG) in Italy.

Objectifs

The project will contribute to a wider European distribution network of CNG and LNG able to push the gradual transition towards a more sustainable refuelling system. The project is in line with EU Directive on Alternative Fuels 2014/94/EU, which has set out minimum requirements for the building-up of alternative fuels infrastructure, including refuelling points for natural gas (CNG and LNG). Half of the refuelling stations are expected to be located along the Trans-European Transport Network (TEN-T) Corridor in Italy and part of the deployed network will be located within the cohesion priority regions of Italy.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 25 million

Coût total (montant approximatif)

EUR 56 million

Aspects environnementaux

The project components consist of short connections to the distribution networks and the respective fuelling stations. The stations are using proven technologies. They are expected to have limited environmental impact, which will typically be related to noise nuisance and disturbance during construction and, for a large part of them, to the industrial risks of works implemented on existing fuelling stations. The project components fall under Annex II of Directive 2011/92/EU as amended by 2014/52/EU. The project is not expected to negatively affect the local environment and is thus not expected to require an Environmental Impact Assessment (EIA). However, it is required the project is screened by the respective national authorities for environmental impact including the impact on sensitive areas, which include nature conservation sites. The main benefits of the project are expected on air quality and pollutant emissions with significant reductions of sulphur, particle matter and Nitrogen Oxide (NOx).

Passation des marchés

The promoter has been assessed by the EIB as being a private company sitting outside regulated activity of its parent company and hence not being subject to EU rules on public procurement or concessions. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation Directive 2014/25/EU or 2004/17/EC, where applicable, then the Bank would require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation 2014/25/EU or 2004/17/EC, where applicable, as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

Statut

Signé - 6/06/2019

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Italie Énergie