Recherche Fr menu ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170404
    Date de publication: 17 juillet 2017

    Promoteur – Intermédiaire Financier

    DENHAM CAPITAL

    Lieu

    Description

    The project consists of an equity participation in a fund investing in energy and renewable energy generation projects in Africa, southeast Asia and Latin America.

    Objectifs

    The fund aims to invest across five to eight investment platforms by backing experienced power project developers/management teams with deep knowledge of local markets.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    USD 35 million (EUR 30 million)

    Coût total (montant approximatif)

    USD 1000 million (EUR 851 million)

    Aspects environnementaux

    Given the technical characteristics of the potential investments (large greenfield power-generation projects) contemplated by the fund, most of them will require a full environmental and social impact assessment (ESIA). The fund is currently developing a fully-fledged environmental and social management system (ESMS), and will be required to integrate it into the fund's procedures. The assessment of the environmental and social (E&S) impact and risks will be part of the standard due diligence process that the fund will carry out for every project. The bank will be consulted both for the final drafting of the fund's E&S documentation and procedures, as well as for the incorporation of E&S obligations into the fund's legal documentation. The capacity of the fund manager to assess and monitor E&S impact and risks of the individual investments and to implement the necessary requirements/mitigation in compliance with national law and in line with the principles and standards of relevant EU environmental legislation, as well as the bank's E&S standards, will be further assessed during appraisal.

    Passation des marchés

    The bank will require the fund to ensure that implementation of the projects they invest in has been and will be done in accordance with the bank's Guide to Procurement (in line with the bank's Equity Risk Guidelines). Of particular relevance will be to ensure that for EIB-eligible investment, appropriate procedures have been followed with regard to the granting/obtaining of concessions (or other contractual arrangements) in line with EIB procurement standards, notably in terms of international publicity, traceability and non-discrimination of bidders.

    Statut

    Signé - 17/07/2018

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Régional - Afrique Régional - Asie Régional - Amérique latine Énergie