Date de publication: 11 février 2020
Promoteur – Intermédiaire Financier
PROVINCIA AUTONOMA DI TRENTOLieu
Description
Framework loan for public sector entities to finance the construction of public infrastructure, including green/climate-change investments, in the territory of the Autonomous Province of Trento.
Objectifs
The operation will support a multi-sector investment programme of the Province of Trento. The investment programme is plan-led and well-embedded in the context of the province's development strategy, addressing a balanced territorial development. The selected schemes focus on climate mitigation and adaptation. The schemes will include energy efficiency and adaptation to weather events across the province and improvement of the public services provision.
Commentaires
n/a
Secteur(s)
- Aménagement urbain - Construction
- Industrie - Construction
Montant BEI envisagé (montant approximatif)
EUR 335 million
Coût total (montant approximatif)
EUR 444 million
Aspects environnementaux
The schemes financed are small and, basically, located in consolidated urban areas. During appraisal and allocation, the Bank will check that the promoter complies with Directive 2014/52/EU amending the EIA Directive 2011/92/EU should any scheme falls in Annex II of the above-mentioned Directive and that plans and programmes comply with to SEA Directive 2001/42/EC when relevant. The new and refurbished buildings are subject to the Energy Performance of Buildings Directive (2010/31/EU) and its amendments included in the 2018/844/EU, when relevant.
Passation des marchés
The Bank will require the promoter to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation, Directives 2014/23/EU or 2014/24/EU, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.
Statut
Signé - 17/12/2019
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).