Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170114
    Date de publication: 24 janvier 2018

    Promoteur – Intermédiaire Financier

    INDEPENDENT POWER TRANSMISSION OPERATOR SA

    Lieu

    Description

    The proposed project concerns the interconnection of the island of Crete with mainland Greece, in the region of Peloponnese. The project includes two AC 150 kV submarine cables, 150 kV underground and overhead circuits, a compensation terminal in the Peloponnese and network reinforcements associated to the interconnection. The landing points of the submarine cables are in Kissamos bay (Crete) and the Malea peninsula (Peloponnese).

    Objectifs

    The project will (a) enable the replacement of thermal generation on the island (mainly oil-fired generation units) with more efficient generation from mainland Greece and (b) increase the hosting capacity of the island for renewable energy sources.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 178 million

    Coût total (montant approximatif)

    EUR 356 million

    Aspects environnementaux

    Some of the investments fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU, thus requiring a review by the competent authorities at the planning/consent stage. The potential impacts of the project include visual impact, vegetation clearance, electromagnetic fields, noise nuisance, birds' collision and mortality, disturbance and damage of marine flora and fauna. Environmental impact studies will be carried out as applicable and mitigating and/or compensation measures will be applied as necessary.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU, where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the European Union, as and where required.

    Statut

    Signé - 9/05/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Grèce Énergie