Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20170037
Date de publication: 9 octobre 2020

Promoteur – Intermédiaire Financier

ENI SPA

Lieu

Description

The project concerns a Framework Loan (FL) for the implementation of a number of renewable energy (RE) plants (solar photovoltaic (PV) and onshore wind) schemes in Italy, promoted by ENI.

Objectifs

The operation contributes to the EU-wide target of 32% of energy from renewable sources in gross final energy consumption (RES) by 2030 as set out in the EU RE Directive (Directive (EU) 2018/2001). It further contributes to the national renewable energy targets laid out in Italy's Integrated National Energy and Climate Plan (NECP). In addition, the majority of investments will also be located in convergence regions.

Commentaires

N/A

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 75 million

Coût total (montant approximatif)

EUR 151 million

Aspects environnementaux

The Bank will assess and, if needed, will reinforce the Promoter's capacity to appraise sub-schemes for compliance with national regulations and EU environmental and biodiversity requirements, specifically Habitats and Birds Directives (92/43/EEC and 2009/147/EC respectively), as well as its capacity to support the Bank's Public Disclosure Policy, which aims at facilitating access by the public to environmentally relevant information.

Passation des marchés

The Bank will require that the Promoter ensure that contracts for the implementation of the project have been / will be tendered in accordance with the relevant applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Statut

Signé - 11/03/2021

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Italie Énergie