    Référence: 20170030
    Date de publication: 6 septembre 2022

    Promoteur – Intermédiaire Financier

    NEMZETI INFRASTRUKTURA FEJLESZTO ZRT

    Lieu

    Description

    Construction of a 56.7 km section of the M85 expressway between Csorna and Sopron.

    Additionality and Impact

    The new M85 expressway is a strategic link of the Vienna - Wiener-Neustadt - Sopron - Gyor - Budapest corridor included in the Hungarian National Transport Infrastructure Development Strategy (NTIDS). The project provides a bypass function to several towns and thus is an essential component of their strategic urban mobility plans in terms of sustainability and health. The project is located in a less developed region under both the 2014-2020 and 2021-2027 EU Cohesion Policies.

    EIB long-term financing and its flexibility regarding e.g. drawdown currency provides additional value for the Promoter in comparison to the terms of alternative financing options such as those typically available on the Bond market.


    Objectifs

    The project is a cross-border strategic link contributing to further integration between Hungary and Austria. The new M85 expressway is an element of the Vienna - Wiener-Neustadt - Sopron - Gyõr - Budapest strategic corridor included in the Hungarian National Transport Infrastructure Development Strategy (NTIDS). The project is located in a less developed region both under the 2014-2020 and 2021-2027 EU Cohesion policies.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 275 million

    Coût total (montant approximatif)

    EUR 551 million

    Aspects environnementaux

    The requirements of the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/ will be verified during appraisal.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation, namely, Directive 2014/24/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Approuvé - 21/09/2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Hongrie Transports