    Référence: 20160947
    Date de publication: 6 octobre 2017

    Promoteur – Intermédiaire Financier

    NATIONAL AUTHORITY FOR TUNNELS

    Lieu

    Description

    The project consists of rehabilitation of metro line 1 of the Cairo metro network. The rehabilitation includes the renewal of the signalling system, telecommunications equipment, centralised control system, power supply, track repairs and the electrical and mechanical systems.

    Objectifs

    The project is expected to deliver significant time savings to existing users of metro line 1 and to provide additional capacity to accommodate an increasing demand that would otherwise be absorbed by less environmentally friendly modes of transport. The upgrade of the metro line will improve the reliability of the existing metro service and further reduce headways during peak hours. It will represent a fast and affordable transport solution to the population, in particular to those who cannot afford owning a private car. Furthermore, the project will result in vehicle operating cost savings, lower air emissions and less accidents stemming from the expected modal shift from road to public transport.

    Commentaires

    Funding for this project could be part of the EIB's new "Economic Resilience" initiative aimed at strengthening economic resilience in neighboring countries by modernizing and expanding economic and social infrastructure and stimulating growth Sustainable development and job creation.

    Secteur(s)

    Garantie au titre du MPE

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Montant BEI envisagé (montant approximatif)

    EUR 350 million

    Coût total (montant approximatif)

    EUR 770 million

    Aspects environnementaux

    If the project was located within the EU, it could fall under Annex II of the EIA Directive 2011/92/EC, thus requiring a decision by the competent authority to determine whether a full environmental impact assessment (EIA) has to be carried out. The Bank shall investigate environmental and social aspects during appraisal and verify that the promoter has followed the relevant EU environmental and social principles, standards and practices. The Bank shall also verify the acceptability of the project in terms of likely environmental impacts and proposed mitigation and compensation measures.

    Passation des marchés

    The Bank will require the promoter to ensure that any procurement process is consistent with the Bank's procurement guidelines.

    Statut

    Signé - 20/01/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Égypte Transports