    Référence: 20160393
    Date de publication: 13 juin 2016

    Promoteur – Intermédiaire Financier

    MINISTRY OF INFRASTRUCTURE AND CONSTRUCTION/GDDKIA

    Lieu

    Description

    The project consists of the construction of an approximately 17km long 2x2 lane expressway in a mountainous area in southern Poland on a new alignment, including a 2 km tunnel. The section is part of the S7 linking the city of Krakow to the Slovak border.

    Objectifs

    The project concerns the construction of an approximately 17 km long 2 x 2 lane expressway along the new alignment in southern voivodship of Poland – Malopolskie. It is part of the S7 road crossing Poland in the north-south direction, from Gdansk through Warsaw and further south to Krakow and Slovakia. The project addresses a section south of Krakow, between Lubien and Rabka, and will facilitate the passage of long-distance cross-border as well as regional traffic between Krakow region and Warsaw and will improve traffic conditions on a congested section between Krakow and Zakopane (the main Polish mountain resort) and Slovakia. The project includes construction of 2 km of road tunnel as well as approximately 5 km of viaducts and bridges, 2 interchanges and 3 service areas. The project will complement the investments made so far on the southern section of S7 expressway.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 200 million

    Coût total (montant approximatif)

    EUR 470 million

    Aspects environnementaux

    The project involves expressway road construction largely in a rural mountainous area. The project falls under Annex I of Environmental Impact Assessment (EIA) Directive 2011/92/EU, as amended, requiring a full EIA procedure. A positive environmental decision was issued in 2010 and then amended in 2013 and 2014 after a supplementary EIA procedure. The project doesn't cross any Natura 2000 territory, but several sites (PLH12009 Raba z Mszanka; PLH120043 Lubon Wielki; PLH120018 Ostoja Gorczanska and PLB120001 Gorce) are located nearby at a distance of between 2.5 and 8 km. Therefore, the provisions of the Habitats Directive (92/43/EEC, as amended) and Birds Directive (2009/147/EC) apply. The investments are included in the national road construction programme and the current operational programme for infrastructure and environment, both of which were subject to a form of strategic environmental assessment.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required. The main works tenders in 3 lots were issued on 24 December 2014 (OJEU 2014/S 248 – 437659; 437569 and 437631). The tender for supervision was issued on 7 August 2015 (OJEU 2015/S 151 – 278740).

    Statut

    Signé - 24/01/2017

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Transports