Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20160374
    Date de publication: 4 décembre 2017

    Promoteur – Intermédiaire Financier

    BERLINER VERKEHRSBETRIEBE (BVG) AOER

    Lieu

    Description

    The project will finance the acquisition of around 630 new metro vehicles and around 100 tram vehicles for the Berlin public transport network. The new vehicles will replace age-expired rolling stock and will contribute to enlarging the fleet to accommodate growing passenger volumes, as the city is growing too. The new rolling stock will be owned and operated by the promoter, Berlin's public transport operator Berliner Verkehrsbetriebe (BVG).

    Objectifs

    The project will make an important contribution to the renewal of BVG's fleet and to the quality and efficiency of public transport in Berlin, thereby supporting the shift away from individual motorised transportation.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 700 million

    Coût total (montant approximatif)

    EUR 1585 million

    Aspects environnementaux

    The construction of new rolling stock does not fall within the scope of Directive 2011/92/EU since it will take place in the manufacturer's plants. Therefore, no Environmental Impact Assessment (EIA) is required for the tram rolling stock. There may be associated infrastructure works. The works for the construction of tramway and metro infrastructure are classified under Annex II of the directive. During the appraisal of the project, compliance will be checked and the Bank's loan will be conditional to obtaining all the corresponding/necessary official statements. The project is expected to deliver positive environmental benefits thanks to the new vehicles' improved energy efficiency.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been and shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/17/EG and 2014/25/EU as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the European Union. Trams and metros under the following tenders will be part of the project: 2005/S 102-102250 d.d. 28.05.2005, 2011/S 42-069030 d.d. 2.3.2011, 2016/S 241-439844 d.d. 14.12.2016 and 2016/S 242-441852 d.d. 15.12.2016.

    Statut

    Signé - 14/12/2017

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Allemagne Transports