Recherche Fr menu ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20160289
    Date de publication: 26 janvier 2018

    Promoteur – Intermédiaire Financier

    CAISSE DE DEPOT ET PLACEMENT DU QUEBEC,CKD INFRAESTRUCTURA MEXICO SA DE CV,ENEL GREEN POWER SPA

    Lieu

    Description

    Through a project finance scheme, the EIB loan will partly finance three solar photovoltaic plants in Mexico as part of the country's clean energy transition plan.

    Objectifs

    This is an important project for the EIB outside the EU, as it supports climate-related investments in developing countries. At post-approval stage, the plants resulted in having a combined capacity of 1.088 MWp, which at appraisal stage was 991 MW.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    USD 87 million (EUR 70 million)

    Coût total (montant approximatif)

    USD 1000 million (EUR 810 million)

    Aspects environnementaux

    If the solar photovoltaic plants were located within the EU they would fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending the EIA Directive 2011/92/EU), requiring the competent authorities to determine whether an is required. Following Mexican national legislation full EIA and Social Impact assessments are mandatory for such projects. Due to the specificities of the land tenancy in Mexico, the social impacts will be carefully assessed at appraisal. Compliance with the EIB's environmental and social standards and the principles of relevant EU Directives, will be verified at appraisal.

    Passation des marchés

    The EIB will require the promoter to ensure that implementation of the project will be done in accordance with EIB's Guide to Procurement.

    Statut

    Signé - 25/09/2018

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Mexique Énergie