    Référence: 20160227
    Date de publication: 21 juin 2016

    Promoteur – Intermédiaire Financier

    TAMPEREEN KAUPUNKI

    Lieu

    Description

    Construction of the first tramway line in the city of Tampere

    Objectifs

    The project consists of the first tramway line in Tampere, the third-largest city in Finland with more than 200,000 inhabitants. The 23.5 km route will link the city centre with Sampola, where branches would continue to the University Hospital of Tampere and Hervanta.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 165 million

    Coût total (montant approximatif)

    EUR 330 million

    Aspects environnementaux

    The project falls under Annex II of the Environmental Impact Assessment (EIA) Directive. Compliance with the EIA Directive, as well as with other relevant directives (i.e. Habitats and Birds) will be checked during appraisal.
    Overall, the project can be expected to contribute to an improvement of the urban environment thanks to lower noise and pollutant emissions by tram vehicles compared to the current buses, and by contributing to the promotion of public transport, reducing individual car use.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU (OJEU), as and where required. The tender for the design and construction works was published in the OJEU on 3 December 2014 (2014/S 233-411156) and the award notice (2015/S 177-320177) was published on 12 September 2015. For the rolling stock acquisition a negotiated procedure (2016/S 066-116079) was published on 5 April 2016.

    Statut

    Signé - 30/09/2017

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Finlande Transports