    Référence: 20160169
    Date de publication: 16 novembre 2018

    Promoteur – Intermédiaire Financier

    IBERDROLA SA

    Lieu

    Description

    Financing for the development and modernisation of electricity network infrastructure throughout Spain during the 2016-2018 period.

    Objectifs

    The overall purpose of the programme is to modernise the electricity distribution network in order to maintain or improve the quality of electricity supply, cater for new system users and improve the overall operational efficiency of the distribution system operator. It also comprises advanced metering infrastructures, as per the country's mandatory roll-out.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 500 million

    Coût total (montant approximatif)

    EUR 1197 million

    Aspects environnementaux

    The project will concern the implementation of electricity distribution schemes and comprises overhead lines with voltage levels up to 132 kV, some of which may require the competent national authority to determine the need for an environmental impact assessment (EIA). The main impacts that can be typically expected for the programme relate to noise nuisance and disturbance during construction, vegetation clearance, visual impact, electromagnetic fields as well as impact on flying vertebrates.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC, or 2014/24/EU where applicable, and/or 2004/17/EC, or 2014/25/EU where applicable, and/or 2014/23/EU where applicable, as well as Directives 89/665/EEC and 92/13/EEC), as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the European Union, as and where required.

    Statut

    Signé - 23/12/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).