Recherche Fr menu ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20160058
    Date de publication: 20 septembre 2016

    Promoteur – Intermédiaire Financier

    Private Entity(ies)

    Lieu

    Description

    The project is an allocation under the IREDA-RENEWABLE ENERGY AND ENERGY EFFICIENCY framework loan. The project will contribute to the financing of a 100 MW wind farm within the state of Andhra Pradesh to replace electricity generation from fossil-fuel based plants.

    Objectifs

    The project will contribute to the development of renewable energy projects undertaken by private sector enterprises in India, reducing air pollution and greenhouse gas emissions.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 27 million

    Coût total (montant approximatif)

    EUR 104 million

    Aspects environnementaux

    The project, if located in the EU, would fall under Annex II of the Environmental Impact Assessment (EIA) Directive, leaving to the competent authority the decision as to whether an EIA is required or not. According to the applicable Indian law, wind power projects do not require an EIA. Under the conditions of the related framework loan, the promoter is required to carry out an environmental and social impact assessment (ESIA) study for the project. The Bank will review ESIA documentation during appraisal and ensure adherence to its environmental and social standards.

    Passation des marchés

    The implementation of the project will be done in compliance with the Bank's Guide to Procurement. The Bank will monitor the procurement process to ensure compliance with the guidelines.

    Statut

    Approuvé - 15/11/2016

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Inde Énergie