Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20150778
    Date de publication: 4 octobre 2016

    Promoteur – Intermédiaire Financier

    CEPS AS

    Lieu

    Description

    Multi-component investment programme covering the period 2016-2020 aiming to reinforce the electricity transmission infrastructure of the Czech Republic

    Objectifs

    The project is expected to enable the promoter to improve the safety of the system, support the efficient operation of the electricity market in central and eastern Europe and maintain the reliability and quality of electricity supply.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    CZK 3000 million (EUR 111 million)

    Coût total (montant approximatif)

    CZK 6000 million (EUR 222 million)

    Aspects environnementaux

    The project concerns electricity transmission schemes (overhead lines, new substations and works in existing facilities) some of which will fall under Annex I of the Environmental Impact Assessment (EIA) Directive and will have to undergo an obligatory environmental impact assessment, while most of the remainder will fall under Annex II, which requires the competent national authority to determine the need for an EIA. The main impact that can typically be expected for a project of this nature relate to visual impact, vegetation clearance, electromagnetic fields, noise nuisance, impact on flying vertebrates and disturbance during construction. Environmental and social (E&S) aspects will be reviewed during appraisal to ensure alignment with Bank E&S requirements.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, (i.e. Directive 2014/25/EU or Directive 2004/17/EC where applicable, as well as Directives 89/665/EEC , 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 15/12/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    République tchèque Énergie