Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20150717
    Date de publication: 17 mars 2016

    Promoteur – Intermédiaire Financier

    TERRITORIO HISTORICO DE VIZCAYA

    Lieu

    Description

    The operation concerns the financing of water and wastewater investments in the province of Vizcaya, located in the Basque Country in Spain.

    Objectifs

    The project will focus on water and wastewater investments across the province, to anticipate floods and droughts as a consequence of climate change, by increasing the resilience of bulk water and storm water collection systems. The wastewater investments will also ensure compliance with the environmental standards set by EU and national legislation.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 90 million

    Coût total (montant approximatif)

    EUR 180 million

    Aspects environnementaux

    Water supply components will optimise and improve resilience of water supply systems in different municipalities of the benefit area. Wastewater components are driven by a need to comply with the EU Urban Wastewater Treatment Directive 91/271/EEC and the Water Framework Directive 2000/60/EC. The project will have a strong positive effect on the environment, contributing to pollution abatement by improving the quality of effluents discharged to surface waters. Project regulatory requirements (environmental impact assessment, strategic environmental assessment, Natura 2000) will be assessed during appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 30/06/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Espagne Eau, assainissement