Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20150497
    Date de publication: 4 novembre 2015

    Promoteur – Intermédiaire Financier

    RENFE OPERADORA

    Lieu

    Description

    The project concerns the upgrade and modernisation of existing railway stations with the objective of enhancing the quality of service of Renfe Operadora.

    Objectifs

    The project helps to promote sustainable transport, mitigate climate change, as well as economic and social cohesion by supporting investment in the region.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 65 million

    Coût total (montant approximatif)

    EUR 137 million

    Aspects environnementaux

    The investment schemes included in this operation typically fall outside of the scope of the Environmental Impact Assessment (EIA) Directive. However, this will be further analysed during the appraisal, together with the potential impact (both positive and negative) of the investments. Compliance with the EIA Directive, as well as any potential significant or negative impact of the project on areas included in the Natura 2000 network (according to the Habitats Directive 92/43/EEC and the Birds Directive 2009/147/EC) will be assessed during appraisal. All the investment schemes will support the competitiveness of rail – a sustainable mode of transport – which should lead to environmental benefits.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/will be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Approuvé - 7/09/2015

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Espagne Transports