Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20150465
    Date de publication: 8 novembre 2016

    Promoteur – Intermédiaire Financier

    ACCEPTABLE BANK(S)

    Lieu

    Description

    Co-financing of renewable energy projects in France, especially in onshore wind, solar photovoltaics (PV), geothermal, biomass and small hydropower

    Objectifs

    The project aims to contribute to renewable energy targets in France and the EU.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 1125 million

    Coût total (montant approximatif)

    EUR 1500 million

    Aspects environnementaux

    This operation is intended to generate environmental benefits by supporting projects that help mitigate climate change. Due to their technical characteristics, some of the individual projects to be proposed for allocation are likely to fall under Annex II of the EIA Directive, leaving it to the national competent authority to determine according to Annex III of the said directive whether an environmental impact assessment is required. The Bank will assess the capacity and procedures of the financial intermediaries (FIs) to be selected to ensure compliance with national and European environmental and biodiversity regulations as well as their capacity to support the Bank's public disclosure policy, which aims to facilitate=e access by the public to environmentally relevant information.

    Passation des marchés

    The Bank will require the FIs to ensure that contracts for the implementation of the projects are tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required

    Statut

    Signé - 19/12/2017

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    France Énergie