Date de publication: 14 juillet 2015
Promoteur – Intermédiaire Financier
LANDESHAUPTSTADT INNSBRUCKLieu
Description
Extension of the tram network infrastructure and acquisition of rolling stock.
Objectifs
The project comprises investments in infrastructure and rolling stock for the Tram/Regionalbahn Innsbruck. The network runs from Völs in the west through the city centre of Innsbruck via the Olympic Village to Rum in the east. The project includes investment in new infrastructure (approximately 12km), adaptations of existing infrastructure (approximately 9 km) and in new trams (approximately 50 vehicles). The demand for public transport in Innsbruck is increasing not only due to growth in the population, but also due to modal shift. The new trains and extended network will increase the attractiveness and improve the efficiency of the public transport system.
Secteur(s)
- Transports - Transports et entreposage
Montant BEI envisagé (montant approximatif)
EUR 150 million
Coût total (montant approximatif)
EUR 335 million
Aspects environnementaux
Construction of tramways and, if any, depots, falls within the scope of Annex II of Directive 2011/92/EU. Accordingly, the competent authority must decide on the requirement of an environmental impact assessment (EIA). Compliance with the EIA Directive, possible impact on protected areas (EU Directives 2009/147/EC and 92/43/EEC) as well as the possible cumulative impact with adjacent projects (in accordance with Directive 2001/42/EC on strategic environmental assessment) will be checked during the appraisal. Overall, the project can be expected to contribute to an improvement of the urban environment thanks to reduced emission of noise and pollutants by tram vehicles compared to the current buses, and by contributing to the promotion of public transport, reducing individual car use.
Passation des marchés
The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Statut
Signé - 28/07/2016
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).