    Référence: 20150333
    Date de publication: 26 février 2016

    Promoteur – Intermédiaire Financier

    MINISTRY OF TRANSPORT AND COMMUNICATIONS

    Lieu

    Description

    The Sofia Ring Western Arc Construction project comprises the reconstruction of an existing urban motorway and an important portion of the Sofia Ring Road. The project has a total length of 8.537 km and includes 5 road interchanges, 1 bridge over a river, 1 road overpass, 2 railway overpasses, 3 roundabouts, 2 motorway viaducts (multi-span bridges), retaining walls and reinforced embankments as well as the reconstruction and relocation of several affected utility networks. The project is in line with the Sofia Municipality Development Plan and will connect major motorways, already financed by the EIB: the Lyulin Motorway and the Northern Speed Tangent, ultimately connecting to the Sofia-Kalotnia and Hemus motorways. The project is located on the Trans-European Transport Network (TEN-T), co-financed by the EU Cohesion Fund, and is implemented by the Road Infrastructure Agency.

    Objectifs

    The new motorway will reduce congestion and traffic and improve urban mobility and safety. The project will increase traffic speeds and thus contribute to travel time and operating cost savings.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 9 million

    Coût total (montant approximatif)

    EUR 46 million

    Aspects environnementaux

    This project falls under Annex II of the Bulgarian Environmental Act as well as Environmental Impact Assessment (EIA) Directive 2011/92/EU Article 10 e. In line with the Ministry of Environment and Water (MoEW) Decision (No 34-PR/2010) dated 27/09/2010 there is no necessity to carry out an EIA. The nearest Natura 2000 protected sites are located some 7 km away from the proposed development. The competent authority concluded that the project is not likely to exert a negative impact on natural habitats, populations and habitats of species subject to conservation.

    Passation des marchés

    The project has been procured by the Road Infrastructure Agency (RIA) and contracts have been awarded through international open tenders in accordance with Directive 2004/18/EC.

    Statut

    Approuvé - 2/05/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Bulgarie Transports