Référence: 20150240
Date de publication: 14 juillet 2015

Promoteur – Intermédiaire Financier

WINDPLUS, S.A., a company controlled by EDP Group, the Portuguese global utility company, and Repsol, the Spanish global oil and gas company.

Lieu

Description

The project covers the design, installation, operation and maintenance of a 25 MW floating offshore wind farm about 20km off the coast of Portugal, in 85-100m water depth. The project will comprise 3-4 floating substructures with state-of-the art wind turbines of the 6-8 MW class from a reputable supplier. The project would also include export cable sections to a fixed sub-sea cable connection that is to be installed and operated by the transmission system operator.

Objectifs

The development of offshore wind energy supports EU and national targets for renewable energy generation and contributes to security of energy supply and environmental objectives. The project is therefore eligible under Article 309 point (a) projects for developing less-developed regions and point (c) common interest.

Commentaires

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 60 million

Coût total (montant approximatif)

EUR 139 million

Aspects environnementaux

The project falls under Annex II of the Environmental Impact Assessment (EIA) Directive, leaving it to the competent authorities to screen the project in or out based on adequate criteria. The competent authorities have screened the project out due to its relative small size (3-4 turbines) and due to its location outside protected areas. Although no full EIA is required, it will be necessary to go through a less restrictive environmental incidences study, for which comprehensive environmental studies are being produced. No major environmental and social risks are known at this stage.

Passation des marchés

The promoter is excluded from the provisions of Directive 2004/17/EC through the exemption in its Article 24 (e) as the project relates to collaborative research and development services where the benefits are shared between the stakeholders, thus not subject to EU rules on public procurement. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation (i.e. Directive 2004/17/EC), then the Bank would require the promoter to ensure that contracts for the implementation of the project have been/will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC and Directive 92/13/EEC), with publication of tender notices in the EU Official Journal, as and where required.

Statut

Signé - 18/10/2018

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).