    Référence: 20150223
    Date de publication: 9 septembre 2015

    Promoteur – Intermédiaire Financier

    ESPOON KAUPUNKI

    Lieu

    Description

    The project consists of the extension of the existing metro line between Matinkylä and Kivenlahti in Espoo, Finland.

    Objectifs

    This investment loan aims at financing the second phase of Westmetro, from Matinkylä to Kivenlahti in the city of Espoo, the second most populated city in the metropolitan area of Helsinki. The project includes the construction of a 7km double-track underground metro tunnel as well as an underground metro depot. The Westmetro extension project will serve five additional stations located in Espoo.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 515 million

    Coût total (montant approximatif)

    EUR 1281 million

    Aspects environnementaux

    The project is an urban underground railway and therefore falls under Annex II of the Environmental Impact Assessment (EIA) Directive. According to this directive, competent authorities decide on the requirement of an EIA on a case-by-case analysis. A full EIA was carried out for the whole line (from Ruoholahti in Helsinki to Kivenlahti in Espoo) in 2005 and approved in 2006, thus including the section Matinkylä to Kivenlahti. Any additional public consultation or updates as well as building permit procedures will be checked at appraisal stage.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU (OJEU), as and where required. The first tunnelling and civil works contracts have already been tendered and published in the OJEU as required (2014/ S122-216394, 2014/ S122-282026, 2014/ S122-252184).

    Statut

    Signé - 30/08/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Finlande Transports