Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20150219
    Date de publication: 16 novembre 2017

    Promoteur – Intermédiaire Financier

    ROAD DEVELOPMENT AGENCY

    Lieu

    Description

    The project consists of the upgrade of the Zambian section of the Great North Road (T2) between Mpika and the border with Tanzania in Nakonde. It further includes the rehabilitation of feeder roads in the Chinsali-Nakonde section, complementary initiatives in the project area and the provision of technical assistance.

    Objectifs

    The project is a joint COMESA/EAC/SADC Aid for Trade Initiative, the primary aim of which is to lower transport cost along this key regional road corridor. It will contribute transforming centrally located Zambia from a land-locked to a land-linked country, while fostering continental integration and promoting inclusive economic growth and poverty reduction. It will help diversify the Zambian economy and unlock the country's economic potential. The upgrade of the Great North Road will also make the road more resilient to climate change and safer for road users and local communities.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 182 million

    Coût total (montant approximatif)

    EUR 435 million

    Aspects environnementaux

    An Environmental and Social Impact Statement (ESIS) Report has been developed, including public consultations and accompanying management plans of a Resettlement Action Plan (RAP), Stakeholder Engagement Plan (SEP) and an Environmental and Social Management Plan (ESMP).

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 7/08/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Zambie Transports