Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20140768
    Date de publication: 22 juillet 2015

    Promoteur – Intermédiaire Financier

    Landesbank Saar

    Lieu

    Description

    Risk-sharing instrument to cover up to 50% of credit risk associated with a portfolio of renewable energy loans outstanding on SaarLB's balance sheet. As a condition and with the resources made available by the guarantee, SaarLB will grant new loans to eligible renewable energy projects. The new loans will not be covered by the guarantee.

    Objectifs

    This operation will be set up as a risk-sharing instrument covering a portfolio of renewable energy assets. The instrument is designed to facilitate the intermediary to undertake new projects.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 150 million

    Coût total (montant approximatif)

    EUR 300 million

    Aspects environnementaux

    The project comprises a multi-sector multi-scheme operation. All of the schemes are expected to fall under Annex II of Environmental Impact Assessment (EIA) Directive 2011/92/EU. Should any scheme have a negative impact on an area forming part of the Natura 2000 network (as defined under Habitats Directive 92/43/EEC and Birds Directive 79/409/EEC), then the Bank would require the financial intermediary and the final beneficiary to act according to the provisions of the aforementioned directives as transposed into national law.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 30/06/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Allemagne France Énergie