    Description

    The project involves the construction of about 40 km of new roads. The project is exclusively greenfield. It will include 27 km of standard motorway (M11 route), approximately 0.6 km of Type 3 dual carriageway (N11 route), 4 km of Type 2 dual carriageway (N80 Link route) and 8 kilometres of standard single carriageway (N30 route).

    Objectifs

    Sustainable transport - urban and inter-urban

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 109 million

    Coût total (montant approximatif)

    EUR 280 million

    Aspects environnementaux

    The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU, hence an EIA was done and will be checked during appraisal. In addition the Bank will confirm whether a separate strategic environmental assessment (SEA), in accordance with Directive 2001/42/EC, has been done for the project. Compliance with the Habitats Directive (92/43/EEC) and Birds Directive (79/409/EEC) will be examined during appraisal to determine the project impact. The promoter has advised that the site intersects one Natura 2000 area via a 154m bridge over the river Slaney. Final environmental and planning approval has been given (An Bord Pleanala). These and other aspects will be checked during the appraisal process.

    Passation des marchés

    The project is expected to be procured as a public-private partnership (PPP). The PPP company will be responsible for designing, building, financing and operating the investment. The public promoter, the National Roads Authority (NRA), will select the PPP company through an international procurement procedure, which started in July 2013 (with an advertisement in the Official Journal of the EU) and is expected to be completed in May 2015. The procedures and compliance with Directive 2004/18/EC will be determined during the appraisal process.

    Statut

    Signé - 14/10/2015

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Irlande Transports