Recherche Fr menu ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20140436
    Date de publication: 15 mai 2018

    Promoteur – Intermédiaire Financier

    PKP POLSKIE LINIE KOLEJOWE SA

    Lieu

    Description

    The project concerns the modernisation of the Poznan-Szczecin (195 km) section of railway line E59, part of the core Trans-European Transport Network (TEN-T) Baltic-Adriatic corridor.

    Objectifs

    The project, which is a continuation of the line works started several years ago in the southern sections, will upgrade the line to up to 160 km/h for passenger and 100-120 km/h for freight trains, modernise the energy supply and signalling systems. The objective is to increase the quality of rail services in view of encouraging travel by rail and thus enhance sustainable transport in Poland , in line with EU objectives.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 400 million

    Coût total (montant approximatif)

    EUR 1080 million

    Aspects environnementaux

    The project has been subject to an Environmental Impact Assessment (EIA). The EIA and the development consents are to be reviewed during appraisal. The project's potential impacts on protected areas and species, in accordance with the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC), are to be appraised further.

    Passation des marchés

    The EIB will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC, or 2014/24/EU where applicable, and/or 2004/17/EC, or 2014/25/EU where applicable, and/or 2014/23/EU where applicable, as well as Directives 89/665/EEC and 92/13/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 27/03/2019

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Pologne Transports