    Référence: 20140378
    Date de publication: 30 août 2017

    Promoteur – Intermédiaire Financier

    PUBLIC ENTITY(IES), JIRO SY RANO MALAGASY SA

    Lieu

    Description

    The project consists of the expansion of an existing hydropower station (Andekaleka) by two further turbines (unit size 33 MW), including associated equipment and an upstream sand trap. The operation will also reinforce existing substations and networks, associated transformers, switchgear, cables and various auxiliary and control equipment to enable evacuation of the additional power to the main network.

    Objectifs

    The purpose of the project is to increase the country's power generating capacity from indigenous renewable energy sources, so as to lower the dependence on imported fuels and decrease the cost of electricity generation generally.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 31 million

    Coût total (montant approximatif)

    EUR 82 million

    Aspects environnementaux

    If located within the EU, the expansion of a hydropower plant and the substations would fall under Annex II of the EU EIA Directive. According to national environmental legislation, the capacity expansion of the project falls below the national threshold (150 MW) above which an Environmental Impact Assessment (EIA) would be mandatory; thus the authorities have not requested an EIA. The works will be within existing infrastructure; therefore the residual environmental impacts will be less significant. The main temporary impact is expected during construction. The project site is isolated with no immediate neighbours. Any possible negative social impact is thus expected to be negligible. According to the promoter there is no nature conservation site in the vicinity that could be affected.

    Passation des marchés

    Being a public entity the promoter will have to procure works, services and supplies in compliance with the provisions of the Bank's Guide to Procurement. The promoter agreed to comply with these guidelines when tendering the contracts proposed for financing by the Bank. A contract notice for the works and supplies of the second turbine was published in the Official Journal of the European Union.

    Statut

    Signé - 8/12/2017

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Madagascar Énergie