Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20140292
    Date de publication: 28 novembre 2014

    Promoteur – Intermédiaire Financier

    STERN & HAFFERL VERKEHRSGESELLSCHAFT MBH

    Lieu

    Description

    Construction of a rail link between the tram line of the city of Gmunden and the Traunsee regional railway and acquisition of rolling stock.

    Objectifs

    The project will contribute to Gmunden's objective of enhancing the attractiveness of public transport and increasing its market share, and may reduce transport by private car and associated air and noise emissions. It will contribute to upgrading the town centre of Gmunden and provide additional development opportunities for the municipalities of Gschwandt, Kirchham and Vorchdorf. The city of Gmunden as well as the neighbouring municipalities will benefit from SRT Gmunden as public transport accessibility will be much improved, thereby fostering employment, housing, and desirability as a tourist destination.

    Commentaires

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 21 million

    Coût total (montant approximatif)

    EUR 67 million

    Aspects environnementaux

    Construction of tramways falls within the scope of Annex II of EU Directive 92/2011/EC. Accordingly, the competent authority has to decide whether an environmental impact assessment (EIA) is needed. Compliance with the EIA Directive, and also possible impact on protected areas such as Natura 2000 areas and cumulative impacts of underlying strategies (in accordance with Directive 2001/42/EC on strategic environmental assessment (SEA)) will be assessed during the appraisal. Overall, the project can be expected to improve the urban environment thanks to lower noise and pollutant emissions by tram vehicles compared to the current diesel buses, and by contributing to the promotion of public transport, reducing individual car use.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/18/EEC or 2004/17/EEC and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Signé - 9/09/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Autriche Transports