Référence: 20140055
Date de publication: 28 octobre 2014

Promoteur – Intermédiaire Financier

EMPRESA MUNICIPAL DE AGUA POTABLE Y ALCANTARILLADO DE GUAYAQUIL, EMAPAG EP

Lieu

Description

The project concerns the construction of a wastewater treatment plant, associated pumping stations and a limited number of major sewage collectors for the southern part of the city of Guayaquil. The project also includes the installation of around 30,000 wastewater house connections and the rehabilitation of 41 km of main sewers in the La Chala area.

Objectifs

The project will contribute to improving water quality, restoring the landscape and protecting biodiversity, improving sanitation and health conditions, and finally to achieving 100% connection to the sewer system. Improved sanitation conditions and water bodies' quality will reduce health risks related to waterborne diseases and thus contribute to decreasing the mortality rate and enhancing living conditions. The project is also expected to strengthen the promoter's institutional capacity and enhance its service capacity.

Commentaires

This operation is covered by the EU Guarantee for EIB loans outside the EU.

Secteur(s)

  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Garantie au titre du MPE

This operation is covered by the EU Guarantee for EIB loans outside the EU.

Montant BEI envisagé (montant approximatif)

EUR 93 million

Coût total (montant approximatif)

EUR 212 million

Aspects environnementaux

An environmental impact assessment (EIA) has been prepared according to international best practice, in order to evaluate the different project options. The compliance with the standards of the EU EIA Directive will be assessed during appraisal.

Passation des marchés

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

Statut

Signé - 29/07/2015

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Equateur Eau, assainissement