Date de publication: 6 novembre 2014
Promoteur – Intermédiaire Financier
CORPORACION DOMINICANA DE EMPRESAS ELECTRICAS ESTATALESLieu
Description
Implementation of a loss-reduction programme in the electricity distribution system and improvement in the quality of energy supply to the end consumers.
Objectifs
The project aims at improving the availability of power supply, which is crucial for the social and economic development of the country. The project will consist of the rehabilitation of distribution grids, the regularisation of illegal connections and the installation of remote meter-reading equipment. There will also be an information campaign towards the communities to explain the consequences of theft of electricity and how to make payment of bills easier, and to raise awareness on the benefits of energy efficiency and basic safety precautions regarding the use of electricity.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 75 million
Coût total (montant approximatif)
EUR 150 million
Aspects environnementaux
The project involves the rehabilitation of medium voltage and low voltage electricity networks, whose negative environmental impacts are expected to be modest, in most cases limited to disturbance during construction.
Passation des marchés
The Bank will require that the procurement of equipment, works and services for the implementation of the project will be done in accordance with the Bank’s Guide to Procurement.
Statut
Signé - 1/06/2016
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).