    Promoteur – Intermédiaire Financier

    2I RETE GAS SPA

    Lieu

    Description

    Installation of smart metering systems in the distribution networks of 2i Rete Gas throughout Italy

    Objectifs

    The project is part of the promoter's on-going investment programme in its concession areas. The investments are envisaged to be allocated to the installation of smart metering systems in the distribution networks. These investments are aligned with the requirements of the regulatory framework, should improve the quality of service and have the potential to increase efficiency for the gas distribution sector, including potential energy savings due to customers' increased awareness of gas consumption.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 200 million

    Coût total (montant approximatif)

    EUR 415 million

    Aspects environnementaux

    Based on their technical characteristics, the project schemes are not likely to require environmental impact assessments. The anticipated typical impact is minor, mainly temporary in nature, related to installation works as well as waste management, and can usually be well managed by appropriate measures taken by the company implementing the project, also according to European standards (ISO 14001).

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 18/12/2015

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Italie Énergie