Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20130638
    Date de publication: 5 octobre 2015

    Promoteur – Intermédiaire Financier

    NATIONAL AUTHORITY FOR TUNNELS

    Lieu

    Description

    Purchase of additional rolling stock to improve services on line 2 of the Cairo metro, to alleviate traffic congestion and promote public transport in urban greater Cairo

    Objectifs

    The project is fully in line with the strategic objectives set for the Bank's external lending mandate since it will ensure continuous operation of the metro, an important social and economic infrastructure supporting Cairo's urban development, and also contribute to climate change mitigation, as greenhouse gas emissions per passenger are much lower for metro trips than for car trips.

    Commentaires

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Secteur(s)

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 75 million

    Coût total (montant approximatif)

    EUR 187 million

    Aspects environnementaux

    If the project were located in the EU, the acquisition of new rolling stock would fall outside the scope of the Environmental Impact Assessment (EIA) Directive (2011/92/EU, as amended), as its construction will take place in the manufacturer's plants. This also applies to the implementation, meaning no EIA is required for the project.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement. In particular, calls for international tenders will be published in the Official Journal of the European Union, in accordance with the Bank's Guide to Procurement. Procurement is expected to start in the second half of 2015.

    Statut

    Signé - 1/12/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Égypte Transports