Recherche Fr menu ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20130476
    Date de publication: 7 mars 2014

    Promoteur – Intermédiaire Financier

    JAVNO PREDUZECE AUTOCESTE FBIH DOO

    Lieu

    Description

    Construction of a 21 km motorway section Pocitelj - Bijaca on Corridor Vc

    Objectifs

    The project is part of Corridor Vc connecting the Croatian coast to Budapest through BiH and forms part of the South-Eastern axis of the extension of the TEN-T network to neighbouring countries. The project is expected to facilitate trade, develop tourism, promote regional and national economic growth and ultimately contribute to economic and social cohesion in the region. The project is therefore eligible under Art 309 (c).

    Commentaires

    Secteur(s)

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 100 million

    Coût total (montant approximatif)

    EUR 225 million

    Aspects environnementaux

    If located in the EU, the Project, consisting in the construction of a new greenfield motorway, would fall under Annex I of the EIA Directive 2011/92/EU and therefore require a full EIA including public consultations. In FBiH it falls under the Environmental Impact Assessment (EIA) procedure as stipulated by the Law on environmental Protection and pertaining Regulation of BiH. The promoter has already provided an EIA Study for the project carried-out in accordance to the above-mentioned legal framework. Its content and compliance with the principles of the relevant EU directives on SEA, EIA and Nature conservation will be reviewed during appraisal.

    Passation des marchés

    The Bank will require the Promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Statut

    Signé - 11/11/2014

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Bosnie-et-Herzégovine Transports