    Référence: 20130456
    Date de publication: 4 février 2014

    Promoteur – Intermédiaire Financier

    University of Ljubljana

    Lieu

    Description

    The purpose of the project is to construct new premises of the Faculty of Chemistry and Chemical Technology (FKKT) and the Faculty of Computer and Information Science (FRI) of the University of Ljubljana for about 2 650 students and 440 university staff.

    Objectifs

    The investment programme provides space for dedicated buildings for each of the faculties and a common building. The total surface area will be around 30 000 m2. This investment falls within the EIB Structural Programme Loan supporting the implementation of the Slovenian National Strategic Reference Framework (Slovenia EU Funds 2007-2013).

    Commentaires

    None.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 21 million

    Coût total (montant approximatif)

    EUR 68 million

    Aspects environnementaux

    Universities and research institutions are not specifically mentioned in the EIA Directive on Environmental Impact Assessment. An EIA is therefore not required in accordance with the EIA Directive 2011/92/EU. However, parts of the investment cover the construction of new facilities and therefore may be covered by Annex II of the Directive in relation to urban development. Full environmental details will be assessed during appraisal, including the possible impacts on protected flora and fauna (Habitats 92/43/EC and Birds 79/409/EC).

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/18/EC and Dir. 2007/66/EC [amending Directives 1989/665/EEC and 1992/13/EEC]), with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Approuvé - 20/03/2015

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Slovénie Éducation